Harley Davidson Museum
Each boiler cycles only 1-2 times per day as a result of the 20:1 turndown of each boiler (80:1 plant turndown).
City of Racine Powerhouse
Extend the life of a boiler by retrofitting with a new burner. Racine County Power Plant upgraded Kewanee Boilers with High-Efficiency Riello Burners.
Kenosha WWTP
Two firebox boilers and one condensing boiler were installed at the Kenosha WWTP.
General Mitchell International Airport
The Red Boiler Package included Riello RTC Boilers at the General Mitchell Airport in Milwaukee, Wisconsin.
Rock County
Reliable Efficiency Riello Array Boilers and Grundfos Pumps helped Rock County realize energy and cost savings.
Cedarburg High School
Cedarburg High School selected Riello Array Boilers with a Grundfos Pump System.
Luxemburg-Casco School
Luxemburg-Casco Schools installed the McCotter Energy Systems Red Boiler Package with Smith Boilers and Riello Burners.
Lakeland High School
Lakeland High School retrofitted their existing boilers with new high efficiency Riello burners.
Lake Superior State University
With a campus wide upgrade, McCotter Energy Systems provided 62 Grundfos ECM Intelligent Pumps to Lake Superior State University.
Appleton West High School
Appleton West High School upgraded their burners to new high efficiency Riello burners.