Miller Park
Riello Burners and (28) air handling units to heat the bowl area at Miller Park.
Kohl Center
McCotter Energy Systems provided an LJ Wing Coil to the Kohl Center in Madison, Wisconsin.
Stratec Corporation
The Red Boiler Package at Stratec Corporation included (2) Hurst Series S5-X-300-15, (2) Riello RS 300 Burner W/Siemens linkageless controls and (1) Boiler Wizard Plant Master Control.
Elmhurst University
Boiler Room Decentralization and Chiller Plant Relocation at Elmhurst University, McCotter Energy Provided 25 Riello Array Boilers and 15 Grundfos LCS Pumps.
Bay College
McCotter Energy Systems providedd 9 Riello Array boilers and 2 Grundfos CRE ECM Intelligent Pumps to Bay College.
Consumer Products Company
McCotter Energy Systems Red Boiler Package complete with a Riello RLS 400 Burner and Siemens Controls.
Marquette City Hall
Riello Array Boilers with Grundfos Pumps were installed at Marquette City Hall.
Galloway Foods
Galloway Foods chose the Red Boiler Package with Hurst Boiler, Deaerator, Riello Burner, Cain Economizer, and a plant master control.
Beloit College
26 Riello Array Boilers and 48 Grundfos ECM Intelligent Pumps covered the entire campus of Beloit College.
St. Luke’s Hospital
St. Luke's Hospital chose the Oilon burners with Siemens Linkageless Controls, a Grundfos Feedwater Skid System and 5 Integrated Control Panels with Master Plant Control.